Vol 7 No 2 (2024): April-Juni
Akses Terbuka
Peer Reviewed

Aplikasi Iptek Melalui Pelatihan Penyusunan RAB dan Jadwal Pelaksanaan Pekerjaan Pembangunanan Jalan di Desa Sesaot Lombok Barat

Penulis

I Dewa Made Alit Karyawan , Pathurahman , Ratna Yuniarti , I Wayan Yasa , I Dewa Gede Jaya Negara , Hasyim , Rohani

DOI:

10.29303/jpmpi.v7i2.7603

Diterbitkan:

2024-06-08

Unduhan

Abstrak

Sesaot Village is a tourist village in West Lombok Regency, and is the recipient of the Indonesian Tourism Village Award. This village has natural tourist destinations and several artistic and cultural attractions typical of the local community. In order to realize the vision of Sesaot Village as a religious, cultural and independent tourist village, it is very important to pay attention to supporting infrastructure, namely roads. The Sesaot Village has realized government-assisted development funds to carry out road maintenance and construction. This development needs to be closely monitored by the community so that it can achieve targets on time, at the right quality and at the right cost. Supervision can only be carried out if the community has sufficient understanding, especially in budget planning and implementation time plans. Base on current issues, training need be conducted with the following objectives: 1) To give an overview of the complexity involved in creating a budget and schedule for an road infrastructure project; 2) To impart knowledge on the meticulous, accurate, and precise preparation of a Budget Plan (RAB) and timetable. Goal-achieving strategies cover everything from implementation phases to work processes and evaluation. The process of implementation is divided into three primary stages: preparation, implementation, and evaluation. Preliminary survey/observation and socialization are two steps in the preparation stage. The preparation of participant materials and training tools, training, and mentorship activities, as well as the service team's discussion and consideration of the activities' execution, are all included in the execution Stage. Community service activities in the form of training carried out for one day, attended by 20 participants, received a good response from the Village Government and the community. The planned events transpired without a hitch and significantly influenced the participants' capacity to draft the RAB and timetable for the road project's implementation. This is shown by the increase in the average pre-test to post-test scores of most participants.  It is hoped that the knowledge acquired would serve  for being allowed to take part in future monitoring the road construction program in Sesaot Village.

Kata Kunci:

budget, implementation schedule, road project, training, community participation

Referensi

Asalam, A., Karyawan, I. D. M. A. and Muhajirah, M. (2021) ‘Analisis Kerusakan Ruas Jalan Talabiu-Simpasai Kabupaten Bima Menggunakan Aplikasi Provincial And Kabupaten Road Management System (PKRMS)’, Media Bina Ilmiah, 15(7), pp. 4877–4886.

Iskandarsyah, D. et al. (2023) ‘Technology of Classification and Detection of Damage Conditions on the Road Surface’, 7(1), pp. 34–38.

Karyawan, I. D. M. A. et al. (2024) ‘Integrating MMS And GIS to Improve The Efficiency and Speed of Mapping of Urban Road Damage Conditions in Mataram, Indonesia’, Geographia Technica, 19(1), pp. 19–33.

Khafid, S. and Chairunnisa, N. (2021) Desa Wisata Sesaot Lombok Barat Bersolek, Bangun Akses Jalan dan Atraksi Baru, Diakses tanggal 7 Desember 2023. Available at: https://travel.tempo.co/read/1503124/desa-wisata-sesaot-lombok-barat-bersolek-bangun-akses-jalan-dan-atraksi-baru.

LPPD Desa Sesaot (2020) Laporan Penyelenggaraan Pemerintahan Desa. Available at: http://campakamulya2015.blogspot.com/2015/06/laporan-laporan-penyelenggaraan_25.html.

Pemerintah Desa Sesaot (2023) Situs Resmi Pemerintah Desa Sesaot, Diiakses pada tanggal 9 Desember 2023. Available at: https://www.sesaot.desa.id.

Septiyani, K. and Widyanti, N. N. W. (2021) Desa Wisata Sesaot NTB, Jalur Geowisata Suku Sasak Kuno, Diakses tanggal 7 Desember 2023. Available at: https://travel.kompas.com/read/2021/11/06/211600627/desa-wisata-sesaot-ntb-jalur-geowisata-suku-sasak-kuno?page=all.

Suara NTB (2023) Modal Sosial Dan Prestasi, Kades Perempuan Satu-Satunya Di Lobar Bertarung Rebut Kursi DPRD, Diakses tanggal 7 Desember 2023. Available at: https://www.suarantb.com/2023/06/07/modal-sosial-dan-prestasi-kades-perempuan-satu-satunya-di-lobar-bertarung-rebut-kursi-dprd/.

Taufikurrahman, Karyawan, I. D. M. A. and Yasa, I. W. (2022) ‘Study of Road Surface Damage due to Rainwater Puddles using the Pavement Condition Index’, Path of Science, 8(8), pp. 3010–3018..

Cara Mengutip

Karyawan, I. D. M. A., Pathurahman, Yuniarti, R., Yasa, I. W., Negara, I. D. G. J., Hasyim, & Rohani. (2024). Aplikasi Iptek Melalui Pelatihan Penyusunan RAB dan Jadwal Pelaksanaan Pekerjaan Pembangunanan Jalan di Desa Sesaot Lombok Barat. Jurnal Pengabdian Magister Pendidikan IPA, 7(2), 450–458. https://doi.org/10.29303/jpmpi.v7i2.7603